About-network-video:
video-solution:
Related-links:
|
| Building renovation plans
|
|
Engineers will be distributed to the contractor by the sub-station map of the
different types of construction and fitting-map (ABWF) the drawings. The
contractor is required to read these ABWF drawings, and tagged as an example of
Its own request, to submit 3 copies of engineers marked copies of the
drawings. Transport, the road map .1 all of the power supply
system equipment room layout or the region, including cable channels such as the
need for sufficient space for For equipment installation and future
maintenance, contractors and construction contractors need to coordinate and
confirm equipment room or regional The space requirements. .2
Transport road map, building plans and / or civil engineering and structural
plans, such as shown for the maintenance and installation of the path set
Requirement of adequate and appropriate equipment contractor installation
and future replacement. .3 delivery of circuit diagram (DRD) engineers
will be drawn and distributed to the contractor. The contractor is required to
read and marked The delivery of road map in mind, but also confirmed that
all the heavy equipment and materials can be transported along the marked lines.
Reasonable grounds, such as contractors and engineers to accept the case,
engineers will consider accepting a contractor Put forward by the other or
additional requirements. If necessary, the engineers will modify the delivery of
road map, pointing out that the most Line after.
Related Product:
กก
|
| |
|
|