Building renovation plans

    

Engineers will be distributed to the contractor by the sub-station map of the different types of construction and fitting-map
(ABWF) the drawings. The contractor is required to read these ABWF drawings, and tagged as an example of
Its own request, to submit 3 copies of engineers marked copies of the drawings.
 Transport, the road map
.1 all of the power supply system equipment room layout or the region, including cable channels such as the need for sufficient space for
For equipment installation and future maintenance, contractors and construction contractors need to coordinate and confirm equipment room or regional
The space requirements.
.2 Transport road map, building plans and / or civil engineering and structural plans, such as shown for the maintenance and installation of the path set
Requirement of adequate and appropriate equipment contractor installation and future replacement.
.3 delivery of circuit diagram (DRD) engineers will be drawn and distributed to the contractor. The contractor is required to read and marked
The delivery of road map in mind, but also confirmed that all the heavy equipment and materials can be transported along the marked lines.
Reasonable grounds, such as contractors and engineers to accept the case, engineers will consider accepting a contractor
Put forward by the other or additional requirements. If necessary, the engineers will modify the delivery of road map, pointing out that the most
Line after.