1 Overview 1.1 In order to ensure the compatibility of the second phase
system, in the same system, the contractor should use the same manufacturers
The equipment and software. The above requirements apply to the following
system: a) transmission system b) a dedicated telephone system c)
the public service telephone system d) recording system e) Visual
intercom system 1.2 engineered a second phase should be to meet with the
networking and unified operation and management. 1.3 within 30 days of the
entry into force of the contract, the contractor must submit design plans for
approval. Design plans should be A list of lists, including the following
a) the delivery of file directory and file a brief description; b) each
item on the list of planned date of submission and approval of the situation.
List in the monthly progress Report to be updated; c) Outline of the
preparation of progress and in accordance with section 1.4 and 1.5
requirements. 1.4 plan for each project should have a clear date for the
progress. The plan required monthly progress reports Update. Provisions in
various stages of process to the engineers time to submit documents and
information to prepare for Progressive Degree of monitoring and / or
approval. 1.5 formalities in accordance with the contractor to submit
these documents. All documents with a document number should be issued on
Period, a modified version as well as all amendments to records. 1.6
shall be submitted to the system outlined in the statute, the specific
requirements, see "technical specifications" Volume II "special requirements"
And third volumes of "Appendix." 1.7 the preliminary design stage,
including (but not limited to) the following: a) an initial system composed
of the layout of display systems, the Internet, site locations and related
information b) preliminary design calculations to confirm the effectiveness
of the preliminary design is scheduled to meet the needs and requirements of
available c) equipment and cable and design specifications to meet
regulatory requirements d) power consumption and heat estimates The first book dedicated special
requirements specification 37 e) Electromagnetic Compatibility Plan
f) software requirements specification g) a detailed interface
specification (DIS) the first draft of h) software testing and confirmation
of the plan i) system operation plan to demonstrate that they meet the
operational and functional requirements 1.8 the design phase of the
medium-term include (but are not limited to) the following: a) a detailed
layout and configuration of the system b) detailed design calculations
c) the steps in detail d) software design specifications e) Software
Test Description f) Link Agreement g) the installation design, including
equipment installation design, installation instructions, wiring and cross-site
Goods, of civil, building equipment and the installation of information ABWF
h) to submit a model, the contractor should be designed in the mid-principle
approval has been submitted before the 24-week sample Board. 1.9 final
design phase, including (but not limited to) the following: a) install the
maps and records b) the installation program (including cable installation
instructions, installation of major equipment, and other systems Interface
work, etc.) c) maintenance plan 2 to install maps and records (the
final design stage) 2.1 required to submit plans to complete the
installation engineer for approval. Completion of the installation plan should
include the following parts: a) System Settings Chart b) Schematic
c) equipment and associated cable layout routing d) fiber optic cable,
cable and the introduction of follow-up, distribution and use of cored wire
diagram The first book
dedicated special requirements specification 38 e) layout of the indoor
equipment f) layout of equipment racks g) power distribution and access
map h) the installation of equipment specific details Figure 2.2
System Settings should show details of various systems, including systems
interface type, quantity, equipment And cable connections. 2.3 diagram
should show the device name, type, routing and connectivity equipment cable
terminations, including a complete end - Client description, such as pins
and cable distribution of the color code. 2.4 The layout of equipment
should show in detail the location of equipment, cable installation, including
installation details and cable routes By. 2.5 cable, cable and the
introduction of follow-up, distribution and use of cored wire map should show
the introduction of trunk optical cable stations, OCC method of space
communications equipment, follow-up process, the name of loop distribution.
2.6 Layout of equipment racks and other indoor equipment layout should be
shown all the equipment name, location and size. 2.7 Electricity
distribution and access map should show the name of the distributor, the type,
location, and cables, grounding of an Loaded way. Need to explicitly specify
the use of power, the fuse every way cable / circuit breaker / isolation switch
And requirements specified value.