Design the content of contact

    

a) the first contact of the main purpose of design is to allow engineers to understand the preliminary design of the contractor's system
Program, designed to contact the former, the contractor shall provide the preliminary design documents, meeting the main contents of package
Including but not limited to:
Discussion of technical specifications  system;
 discussion system design;
 discuss the overall system configuration diagram;
To discuss all  interface file;
Man-machine interface  discussion;
Graphic symbols  discussion shows, format, device ID, etc.;
 the preliminary design of the system, such as assessment.
b) designed to contact the second main objective is to enable contractors to obtain information on the medium-term design,
And held with the project contractor interface other equipment meeting the main contents include, but are
Are not limited to:
 detailed site survey work;
 interface meetings, determine the interface standards and protocols;
 obtain and verify information on the detailed design;
Operations control center to discuss  indoor equipment layout;
Discuss station  indoor equipment layout;
 discuss the progress of projects;
Availability  discuss plans;
Discussion  install programs;
Open discussion  debug programs;
 identified, such as various types of man-machine interface.
c) contact the third design is the main purpose of the system to identify and confirm the final design, based
Of contact prior to the contractor to provide final design documents, including construction and equipment installation plans
Map, the main contents of the meeting include, but are not limited to:
 determine the system interface;
 external interface of the system;
 determine the detailed system architecture and equipment configuration;
 to determine the number of suppliers of equipment and materials;
 determine the delivery plan;
 determine the installation program;
Opened to determine  debug programs;
 determine the equipment and installation of construction projects;
 working drawings to determine the equipment and installation map;
 final design of the system, such as assessment.