| Factory Acceptance Test (FAT)
|
|
1 Factory Acceptance Test (FAT) in the delivery of the equipment contractor
equipment before the venue. The Test equipment to prove that the hardware
and software can meet the "exclusive specification" requirements. 2 The
equipment to be produced for inspection and testing to ensure that the
requirements for use. Such a test should be Including but not limited to:
a) mechanical structure b) vibration and impact c) environmental
testing d) performance test e) Accelerated Life Test f)
Electromagnetic Compatibility Testing g) the operation and design principles
3 all materials, components, parts, complete sets of equipment,
software, cables and wiring should be tested and certified Prescribed to
meet the "exclusive specification" required standards. Such as the use of
standard commercial products, can provide independent Legislative bodies of
documents to prove that the products comply with the "exclusive specification"
requirements. 4 In accordance with the contractors and engineers to
submit the approval of the relevant standards and norms, the software module
Identify and test to prove that to achieve the required functionality.
5 Routine testing All equipment must be continuous in the production
process of the routine tests carried out. The details of routine tests to be
mentioned Approval to the engineer. Test should include, but are not limited
to the following: a) visual detection Visual inspection, to ensure that
there is no problem with the structure of equipment, equipment to meet the
special norms Requirements. b) diagnostic tests Key components of
each system must be carried out diagnostic tests, including servers,
workstations, Computer peripherals, such as dispatch. 58 c) Performance Test Performance Testing of
integrated features, including system testing, test equipment with the related
equipment Performance requirements. d) saturation test Unless the
engineers agreed to other practices, or in accordance with the normal operation
of the state of simulation set-based approach Prepared to open the power
supply, so that the continued operation of equipment at least 100 hours.
According to consensus, but also To the time period to be divided into
paragraphs. 6 Environmental Testing a) in accordance with this
contract must provide all equipment for all testing to ensure that in the
Function of iron in the environment. b) environmental testing phase, if
there is failure, or modify the design of equipment, you would like to work
Surveyors report. Engineers could decide to repeat the test requirements.
7 tested at the factory 90 days ago, contractors are required to submit
a factory acceptance test plan, so that the engineering Division approval.
The plan should describe the factory acceptance testing of the strategy and
processes. 8 Factory acceptance test plans need to include full
specifications, method statements, procedures and records and so on. Public
Works Factory acceptance test plan should also determine the time-tested.
9 Prior to the delivery to the site, according to the functions of a
complete portfolio of equipment to carry out the functions of all systems
testing, Including the simulation of interface testing. Contractor shall be
in the factory acceptance testing phase of systems and control systems (MCS)
between the test software to verify. 10 factory acceptance testing in
the final structure of simulation software and hardware environment. Some
features or sexual To test conditions and as a result of complex factors can
not be in a simulated environment, such as to be engineers This approval,
you can and the final acceptance tests together. 11 all factory
acceptance tests must be representative of the engineers conducted in the
presence of. The successful completion of testing After the test engineer
will sign documents on behalf of. 12 all factory acceptance tests should
be in full accordance with the test content specifications. Only prior work
The approval of the division process can deviate from the provisions of the
testing methods. Deviate from the details, the reasons for and agreed to deviate
from the Signature must be recorded and included in the testing required to
submit documents. 13 contractors need configuration management
procedures in accordance with the factory acceptance test specification changes.
14 The results of the factory acceptance tests (as well as carried out
because of failed re-test) should be recorded To by the contractors and
engineers to sign the authorized officer. 15 does not mean that the
factory acceptance test at the scene to test the lifting of the contractor or
the notice period because of defects in quality defects Problems and the
need for responsibility