Factory Acceptance Test (FAT)

    

1 Factory Acceptance Test (FAT) in the delivery of the equipment contractor equipment before the venue. The
Test equipment to prove that the hardware and software can meet the "exclusive specification" requirements.
2 The equipment to be produced for inspection and testing to ensure that the requirements for use. Such a test should be
Including but not limited to:
a) mechanical structure
b) vibration and impact
c) environmental testing
d) performance test
e) Accelerated Life Test
f) Electromagnetic Compatibility Testing
g) the operation and design principles
3 all materials, components, parts, complete sets of equipment, software, cables and wiring should be tested and certified
Prescribed to meet the "exclusive specification" required standards. Such as the use of standard commercial products, can provide independent
Legislative bodies of documents to prove that the products comply with the "exclusive specification" requirements.
4 In accordance with the contractors and engineers to submit the approval of the relevant standards and norms, the software module
Identify and test to prove that to achieve the required functionality.
5 Routine testing
All equipment must be continuous in the production process of the routine tests carried out. The details of routine tests to be mentioned
Approval to the engineer. Test should include, but are not limited to the following:
a) visual detection
Visual inspection, to ensure that there is no problem with the structure of equipment, equipment to meet the special norms
Requirements.
b) diagnostic tests
Key components of each system must be carried out diagnostic tests, including servers, workstations,
Computer peripherals, such as dispatch.
 
58
c) Performance Test
Performance Testing of integrated features, including system testing, test equipment with the related equipment
Performance requirements.
d) saturation test
Unless the engineers agreed to other practices, or in accordance with the normal operation of the state of simulation set-based approach
Prepared to open the power supply, so that the continued operation of equipment at least 100 hours. According to consensus, but also
To the time period to be divided into paragraphs.
6 Environmental Testing
a) in accordance with this contract must provide all equipment for all testing to ensure that in the
Function of iron in the environment.
b) environmental testing phase, if there is failure, or modify the design of equipment, you would like to work
Surveyors report. Engineers could decide to repeat the test requirements.
7 tested at the factory 90 days ago, contractors are required to submit a factory acceptance test plan, so that the engineering
Division approval. The plan should describe the factory acceptance testing of the strategy and processes.
8 Factory acceptance test plans need to include full specifications, method statements, procedures and records and so on. Public Works
Factory acceptance test plan should also determine the time-tested.
9 Prior to the delivery to the site, according to the functions of a complete portfolio of equipment to carry out the functions of all systems testing,
Including the simulation of interface testing. Contractor shall be in the factory acceptance testing phase of systems and control systems
(MCS) between the test software to verify.
10 factory acceptance testing in the final structure of simulation software and hardware environment. Some features or sexual
To test conditions and as a result of complex factors can not be in a simulated environment, such as to be engineers
This approval, you can and the final acceptance tests together.
11 all factory acceptance tests must be representative of the engineers conducted in the presence of. The successful completion of testing
After the test engineer will sign documents on behalf of.
12 all factory acceptance tests should be in full accordance with the test content specifications. Only prior work
The approval of the division process can deviate from the provisions of the testing methods. Deviate from the details, the reasons for and agreed to deviate from the
Signature must be recorded and included in the testing required to submit documents.
13 contractors need configuration management procedures in accordance with the factory acceptance test specification changes.
14 The results of the factory acceptance tests (as well as carried out because of failed re-test) should be recorded
To by the contractors and engineers to sign the authorized officer.
15 does not mean that the factory acceptance test at the scene to test the lifting of the contractor or the notice period because of defects in quality defects
Problems and the need for responsibility