| Installation acceptance
|
|
1 The contractor is required before the installation stage of the
installation process and the components of different lines, such as testing, the
Acceptance testing should be submitted two weeks before the start of
acceptance of notice of the installation. And acceptance test is to ensure
that the transport process has not been any damage to equipment, but also
Determine the equipment installation is correct. To do a good job in all
parts of the installation of a good examination records, with the included
All incompatible with a detailed list of items. Non-conformity in the
amendment, to be recorded to correct the situation. 2 obtain all
engineers have the right at any time to check the installation, testing and
equipment pre-set record. If the contractor Every day, there is no
systematic record of all the results of these tests, engineers have the right to
require the contractor to re-enter Line of all these tests in order to avoid
the issue of the accumulation stage to the next. Acceptance of only the
installation phase Allowed after the start of system testing and trial
operation. 3 The contractor is required to complete at the scene,
including a series of each individual sub-system tests and check-by-project
Correct installation and debugging to ensure that the subsystem can in every
aspect of bamboo mold in accordance with the requirements of this special
regulation. Contractor Have to refer to General Regulations bamboo mold-term
acceptance. Contractors to engineers conducted in the presence of post-mortem
Admission. In applying these tests found that the contractor of any defects
must be corrected immediately, the cost of The contractor. 4 The
contractor is required to submit detailed acceptance test data, so that
engineers approved.