Installation acceptance

    

1 The contractor is required before the installation stage of the installation process and the components of different lines, such as testing, the
Acceptance testing should be submitted two weeks before the start of acceptance of notice of the installation.
And acceptance test is to ensure that the transport process has not been any damage to equipment, but also
Determine the equipment installation is correct. To do a good job in all parts of the installation of a good examination records, with the included
All incompatible with a detailed list of items. Non-conformity in the amendment, to be recorded to correct the situation.
2 obtain all engineers have the right at any time to check the installation, testing and equipment pre-set record. If the contractor
Every day, there is no systematic record of all the results of these tests, engineers have the right to require the contractor to re-enter
Line of all these tests in order to avoid the issue of the accumulation stage to the next. Acceptance of only the installation phase
Allowed after the start of system testing and trial operation.
3 The contractor is required to complete at the scene, including a series of each individual sub-system tests and check-by-project
Correct installation and debugging to ensure that the subsystem can in every aspect of bamboo mold in accordance with the requirements of this special regulation. Contractor
Have to refer to General Regulations bamboo mold-term acceptance. Contractors to engineers conducted in the presence of post-mortem
Admission. In applying these tests found that the contractor of any defects must be corrected immediately, the cost of
The contractor.
4 The contractor is required to submit detailed acceptance test data, so that engineers approved.