Interface Test

    

1 Contractor shall be required for each independent subsystem interface to conduct a series of tests to prove that each
Prepared by the independent components and the core of each cable to the location by the location of the forms were correctly installed and by the need to
Adjustment. In addition, the interface test also proves that the subsystems, equipment and cables according to specifications provided by the parties
The performance surface. Contractor to the engineer to submit the details of the test and should be approved by an engineer.
2 Contractor shall use its own resources, during the test will show any possible correction of the defect
Is. Contractor should be corrected immediately after the re-testing, re-tested by engineers at the scene. Such as
Engineers believe that the correction of the contractor to make it possible to modify the project without the other part of the video
Ring, engineers will be asked to retain the right to revert to the test.
3 contractors in each subsystem should be the test is completed, submit three copies of test records system to
Engineers.