Interface protocol test

    

1 Contractor shall interface with the relationship between the designated contractor interface protocol test equipment. When the details of access
I design documents and detailed principles of software design document is approved, the related equipment in these access
I protocol testing.

2 test can be carried out in factories or contractors in the plant for sub-contractors. The principle of the test site should be interface
Norms stipulated in the lead contractor to conduct, but also can be determined through mutual consultation. Test all the agreements are
Must be completed before the factory acceptance tests. If the test fails, will have to be modified, re-test. Contractor
On a protocol test procedures and sub-contractors or other contractors collaboration, and then submit the approved engineer.