Site acceptance test (SAT)

    

1 Field acceptance testing (SAT) is installed after the completion of testing in the field. Test to prove that
Systems or software in accordance with the bamboo mold-specific regulation of the functional and performance requirements.
FBI 2 system in accordance with the provisions of this chapter to 8.10.
3 the need for testing that all systems and subsystems can be followed through all the requirements to run the test
Examination should also include simulation of the state in order to prove the installation is in line with the control / logic form requirements.
4 To test a systematic, sequential and logical manner to determine the starting position from the beginning to the whole Department of
EC, subsystems or phases to promote the desired goal. Test procedure will be carried out should reflect the various test
The order of trial. Typical of the testing phase include (but are not limited to) the following:
a) "continuous testing" - there is no proof of each wire line and consistent with the wiring diagram. (This is an
Test team installed, and then by testing personnel to conduct an independent examination. )
b) "to check a few lines" - for visual testing to ensure that each terminal on the wire then be positive
True, in line with the wiring diagram (which is installed on the test team, and then by the test personnel
Independent examination. )
c) "check the zero line" - for visual testing to ensure that no use of no-contact and terminal wiring.
(This is a test installation team, and then by testing personnel to conduct an independent check.)

d) in every phase of work or modifications to be adjacent to the relay terminals and wiring board to "check
Line number and zero-line "in order to ensure correct wiring. (This is a test installation team, and then by measuring
Inspection staff to conduct an independent examination. )
e) in each circuit to conduct electricity, "wiring diagram of the functional test" to prove that the circuit with the
Wiring diagram. Processor systems in the same "software logic functional tests" in order to permit
The size of each of the characteristics of software modules and the entire system.
5 acceptance testing of all site engineers should be conducted in the presence of. Engineers will be testing on behalf of
The successful completion of acceptance document signed.
6 acceptance testing of all field test requirements should be in full accordance with the contents of the book. Only prior work
The approval of the division process can deviate from the provisions of the testing methods. Deviate from the details, the reasons for and agreed to deviate from the
Signature must be recorded and included in the testing required to submit documents.
7 Contractor shall be in accordance with the configuration management plan (CMP) performance of the site acceptance testing of the configuration management and change
Control.
8 If the test results because the request to amend or re-programming, the engineers decided to affected
Part of a re-test.
9 the results of acceptance tests at the scene, testing the hardware and software versions as well as the unsuccessful re-enter
Line testing records must be authorized by the contractor and engineers to sign on