| Site acceptance test (SAT)
|
|
1 Field acceptance testing (SAT) is installed after the completion of
testing in the field. Test to prove that Systems or software in accordance
with the bamboo mold-specific regulation of the functional and performance
requirements. FBI 2 system in accordance with the provisions of this
chapter to 8.10. 3 the need for testing that all systems and subsystems
can be followed through all the requirements to run the test Examination
should also include simulation of the state in order to prove the installation
is in line with the control / logic form requirements. 4 To test a
systematic, sequential and logical manner to determine the starting position
from the beginning to the whole Department of EC, subsystems or phases to
promote the desired goal. Test procedure will be carried out should reflect the
various test The order of trial. Typical of the testing phase include (but
are not limited to) the following: a) "continuous testing" - there is no
proof of each wire line and consistent with the wiring diagram. (This is an
Test team installed, and then by testing personnel to conduct an independent
examination. ) b) "to check a few lines" - for visual testing to ensure that
each terminal on the wire then be positive True, in line with the wiring
diagram (which is installed on the test team, and then by the test personnel
Independent examination. ) c) "check the zero line" - for visual testing
to ensure that no use of no-contact and terminal wiring. (This is a test
installation team, and then by testing personnel to conduct an independent
check.) d) in every phase of
work or modifications to be adjacent to the relay terminals and wiring board to
"check Line number and zero-line "in order to ensure correct wiring. (This
is a test installation team, and then by measuring Inspection staff to
conduct an independent examination. ) e) in each circuit to conduct
electricity, "wiring diagram of the functional test" to prove that the circuit
with the Wiring diagram. Processor systems in the same "software logic
functional tests" in order to permit The size of each of the characteristics
of software modules and the entire system. 5 acceptance testing of all
site engineers should be conducted in the presence of. Engineers will be testing
on behalf of The successful completion of acceptance document signed.
6 acceptance testing of all field test requirements should be in full
accordance with the contents of the book. Only prior work The approval of
the division process can deviate from the provisions of the testing methods.
Deviate from the details, the reasons for and agreed to deviate from the
Signature must be recorded and included in the testing required to submit
documents. 7 Contractor shall be in accordance with the configuration
management plan (CMP) performance of the site acceptance testing of the
configuration management and change Control. 8 If the test results
because the request to amend or re-programming, the engineers decided to
affected Part of a re-test. 9 the results of acceptance tests at the
scene, testing the hardware and software versions as well as the unsuccessful
re-enter Line testing records must be authorized by the contractor and
engineers to sign on