1 The contractor is required to carry out software testing, including, but not limited to the following:
a) review of specifications
b) review of the code module
c) Module Test
d) FBI software
e) system FBI
f) verification
g) recognition software
h) Durability testing and load testing
i) back to the old test
j) Factory Acceptance Test
k) test run
2 system software only factory acceptance testing requirements and test run. Approved for use by engineers dedicated commercial soft
Pieces does not mean acceptance of the software. Contractor has full responsibility to ensure that all of these standard packages (not
Tube separately or simultaneously implemented) to achieve the required functionality and performance.
3 Review of specifications
a) contractor to the software specification review to ensure that specifications to standardize the documentation phase
Software will be generated.
b) review of specifications should be:
i. to ensure that the document in line with engineering standards;
ii. to confirm the technical programs to meet the requirements;
iii. to ensure that documents are complete, clear and clear.
 
55
c) review the record of specifications to be submitted as part of the test documents.
4 module code review
a) all the software modules must be strictly reviewed to ensure that the software code in accordance with design requirements and in accordance with the
The requirements of the standard programming.
b) As a minimum, code review module to "demonstrate" a list of software code.
c) the code review module to the contractor is composed of representatives of the quality of the independent group.
d) code review module records submitted shall constitute a part of the test documents.
5 Module test
a) each module must be tested to ensure that procedures accurately reflect the design and ensure that by
According to the requirements of the specifications to run.
b) test will be to prove:
i. any valid input, or a combination of several input can generate the correct output.
ii. by control of the correct way to deal with invalid input.
iii. the meaning of clear and display appropriate error message.
c) After each module programmer coding proofing done after the pre-integration after a successful demonstration
Should be tested.
d) for each software module must follow the "special requirements" under Chapter XIV of the Software Measurement Standard
Prospective.
e) module test record shall constitute a document submitted as part of testing, including test specifications,
The use of test tools and methods as well as the input parameters and output results. Test module
Version and revise part of the document must be recorded in the.
FBI software 6
a) in the control module integrated with the environment, and then tested to ensure that the software can be integrated
Accurately reflect the program design and to meet the "exclusive specification" requirements.
b) test will be to prove:
i. any valid input or a combination of input to produce the correct output.
ii. dialogue and the transfer of information between modules of the sort is correct.
iii. by control of the correct way to deal with invalid input.
iv. the meaning of clear and display appropriate error message.
 
56
c) integration software must be followed for each "special requirements" under Chapter XIV of the Software Measurement Standard
Prospective.
d) software, FBI records shall constitute a document submitted as part of the test, including test specifications,
Module version, the use of test tools and methodologies, as well as test input and output parameters of the node
Fruit.
FBI 7 system
a) combination of software and hardware to conduct tests to ensure the system can accurately reflect the system set up
Dollars, and to ensure that in accordance with the "exclusive specification" requirement to run.
b) FBI records system shall constitute a document submitted as part of testing, including test specifications
Books, software version, use the test tools and methodologies, as well as test input and output parameters
Results.
8 Authentication (Verification)
In each design phase, the contractor must verify that the output stage of the design must be able to meet the previous
Seeking. Therefore, the special requirements of the verification process to ensure the continuity and traceability.
9 software to confirm (Software Validation)
a) The contractor is required to identify and confirm that in line with the special requirements of software. Integrated software to pre-acceptance tests
To be confirmed.
b) the contractor to record all test results, constraints, observation and unusual. Trouble in mind
Then recorded to indicate the corrective measures taken.
10 durability testing and load testing (Endurance and Load Test)
a) software system to carry out durability testing and load testing. Constitute the two tests to confirm the test
Or part of factory acceptance testing.
b) durability testing to prove the system is running in the design of the data environment to the time overrun
Paragraph work.
c) load testing to prove the system in a given load conditions (including the peak load) can be reached
To the requirements of performance.
d) the use of a complete system and with external interfaces to the simulation system durability testing and load testing
Test.
11 Old test (Regression Test)
Throughout the testing phase, the contractor shall be modified in software to carry out back to the old test. Back to the old test did not prove
The software does not modify the changes due to damage to software and revised in line with the special requirements of the software.
 
57
12 software verification platform test (Software Proofing Platform Test)
Not applicable.

Related Product:

       