| Special requirements Cable Testing
|
|
a) all new cables to be in accordance with "universal norms" and "Private
Standards" requirements of testing, and remember The test results were
recorded and submitted to Engineer for approval. Contractor is not required to
regulate the provisions of any numerical The results of the test engineer.
b) requires the use of high resistance 1000V Measuring core of each cable on
the cable line all the other cable core Line, on the cable jacket and
insulation resistance-to-ground. Insulation resistance to be not less than 10M
Ohm. c) Each cable core line and the skin to be tested to ensure that
the length of electric cable continuity. d) the contractor will be
responsible for the replacement of non-compliance with the requirements of this
contract all cables.