Submit time

    

1 Design submitted
a) the contractor need to register in accordance with Chapter XV of the "project" as defined in the project schedule to submit its design
And manufacturing time.
b) the contractor under the terms of the contract required the design of the information submitted for approval. The purpose of any approval
Submitted design data, such as the engineers did not fully approved, contractors are required 28 calendar
Days of the date and engineers to carry out the requirements to amend and resubmit. Contractor 3 months
Rolling in time to be specified in the case of such re-submission.
c) is required to submit data to define the design of some important elements, in order to pay as an interim milestone
Monument. Contractor according to the milestone in the realization of these requirements, in order to define access to each design submitted
Approval. To submit these designs include:
i. submit the preliminary design
ii. the design submitted by the medium-term
iii. the final design submitted by
 
The first book dedicated special requirements specification
39
d) the need to submit the preliminary design plan for the establishment of the contractor in response to this contract "technology to
Seek, "" special request "and" General Requirements. " It will take clear and accurate description of the main line
EC design, design constraints, the system's environmental requirements, and other systems and external interfaces and
Capacitive. Submission of documents at least cover the following components:
i. the full technical specifications of the system requirements, system technical specifications, computing books and to be submitted
A summary of all documents and all documents and manuals, the initial plan. Documents
To be successful in the published notice of three calendar months to the engineers.
ii. to the communications room, the station control room equipment, operating the control center equipment, depot
Equipment, stations and tunnels all other related equipment (for example, but not limited to telephone
Installation details, etc.) requirements. Contractor is also required to submit the estimated weight of equipment,
Power consumption, heat and power load requirements.
iii. on the depot's communications requirements and technical specifications
iv. on the positive line of communication (including OCC) requirements and technical specifications
v. on a line with the existing requirements of connecting with the technical specifications
vi. on the interface requirements between systems and technical specifications (DIS) the first draft of
vii. With regard to spare parts, special tools and test equipment of the first draft of technical specifications
e) submission of the mid-term design is to refine the preliminary design, an extension to the main components of the system layer
Surface. It takes the data contain sufficient detail for engineers to consider whether evaluation of the various
Design. Submitted need to include all of the following detailed design documents and design process:
i. Update the preliminary design and provide a detailed design plan submitted.
ii. on the transformation of a detailed construction plans.
iii. all kinds of consoles, dispatch units, terminals and equipment.
iv. Manual of the final plan submission.
v. system to ensure that documents, type test / test and after delivery of the initial technical specification work.
vi. technical manuals, operation manuals, maintenance manuals line, second-line maintenance manual, workshop
Manual work and the purchase of equipment, the draft manual.
vii. spare parts, special tools and test equipment of the second draft of technical specifications.
viii. and interfaces to other systems detailed preliminary technical specifications and detailed interfaces of the initial
Designated, including the Annex III of Volume III, "Interface Specification" DITP set forth in the grass
The following is issued.
 
The first book dedicated special requirements specification
40
ix. DITP for each interface defined in the contract testing interface connector interface test
Special norms (ITSP) the first draft of
x. system requirements specification and system verification and confirmation of the plan.
Owners to provide a project reference to the relevant drawings for the contractor, the contractor has the responsibility for the content of the drawings into
Visit the site to verify and confirm, and verify the results of the implementation of the design drawings. Submitted by the contractor "off
In the transformation of a detailed construction plan "should include (but are not limited to) the following:
 phased construction program (Method Statement)
 old and new software switch procedure (Changeover Plan)
 Recovery Plan (Recovery Plan)
 contingency plans (Contingency Plan)
Software withdrawal  (Fallback) arrangements
 Accident
 risks and countermeasures
Construction period 
Risks and Countermeasures
Construction contractors have to plan in detail a detailed analysis of potential technical risks and associated response (hereinafter
Is part of the risk can be met and the proposed countermeasures), the construction should take appropriate measures to avoid
Impact on the 4th line and a station operator OCC. Contractor shall take appropriate measures to mitigate the risks and for
Tam-related risks.
Description of project risk response / risk mitigation methods
1 as a result of non-travel time is short, test
May be extended to inter-travel time, or too much access
Near travel time and travel time result in
Failed to restore the old software version.
The contractor is required to set a timetable for conducting the tests,
Strictly control the time, set aside sufficient
Time before the resumption of travel time in the old
The normal operation of the software version.
2 in the transformation of the existing system software during the free
Intended to change the functions of the old requirements or the number of
According to the Treasury.
The contractor is required to carry out random regression test
Try to prove that the old functions and database
Not be affected.
3 When the transformation of the software after the completion of all tests
And put into operation after the failure.
Contractor failure requiring immediate sub -
Analysis, correction and, if necessary, to retreat back to
The old software version.
4 one stop supplier of both parts of the equipment,
GM did not have the necessary components.
The contractor is required to complete the study as soon as possible the transformation
A device the necessary equipment and the Department of
Pieces, and with the suppliers to understand the situation
Shape.
5 non-travel time back to the old test of the soft
Case version, but failed to monitor the function of reason
Recovery, until the traffic operations during the period
Contractor in the restoration of the old software version
View the system immediately after the normal delivery
For, in case of any problems immediately with the
 
The first book dedicated special requirements specification
41
Found. Progressive.
6 The improved system or interface system is not entitled
Software assistance agreement, the system can not be shipped normal
For.
On-site verification testing prior to software
Platform test, the successful completion of software Qualcomm
Letter agreement, the database / MMI matching
Testing site before testing.
f) for the final design submitted, the contractor required to complete the design of collaborative interfaces. Final set
Submitted need to include all of the design process and design documents, including previously submitted course work
All the views of engineers and co-design information, which reads as follows:
i. on a transformation of the equipment and interfaces.
ii. all the interface design.
iii. depot communications systems.
iv. are lines (including OCC) communications systems and interfaces.
v. System Design technical specifications and system test specifications.
g) submission of final design (including the transformation of a part) need to include the following:
i. the principle of system design, security, reliability and maintainability review, including electromagnetic
Compatible with the type of documents and test / post-delivery test specifications.
ii. spare parts, special tools and test equipment specifications.
iii. technical manuals, operation manuals, maintenance manuals line, second-line maintenance manual, workshop
Manual work and the purchase of equipment to update the manual version.
iv. trial run of the test is completed the preliminary draft of technical specifications.
v. details of the contract for each interface of the Interface Specification (DIS) interface and detailed test
Plan (DITP).
vi. DITP interface for each interface defined in the contract testing interface to test skills
Operation specification (ITSP).