| Submit time
|
|
1 Design submitted a) the contractor need to register in accordance with
Chapter XV of the "project" as defined in the project schedule to submit its
design And manufacturing time. b) the contractor under the terms of the
contract required the design of the information submitted for approval. The
purpose of any approval Submitted design data, such as the engineers did not
fully approved, contractors are required 28 calendar Days of the date and
engineers to carry out the requirements to amend and resubmit. Contractor 3
months Rolling in time to be specified in the case of such re-submission.
c) is required to submit data to define the design of some important
elements, in order to pay as an interim milestone Monument. Contractor
according to the milestone in the realization of these requirements, in order to
define access to each design submitted Approval. To submit these designs
include: i. submit the preliminary design ii. the design submitted by
the medium-term iii. the final design submitted by The first book dedicated special requirements
specification 39 d) the need to submit the preliminary design plan for
the establishment of the contractor in response to this contract "technology to
Seek, "" special request "and" General Requirements. " It will take clear
and accurate description of the main line EC design, design constraints, the
system's environmental requirements, and other systems and external interfaces
and Capacitive. Submission of documents at least cover the following
components: i. the full technical specifications of the system requirements,
system technical specifications, computing books and to be submitted A
summary of all documents and all documents and manuals, the initial plan.
Documents To be successful in the published notice of three calendar months
to the engineers. ii. to the communications room, the station control room
equipment, operating the control center equipment, depot Equipment, stations
and tunnels all other related equipment (for example, but not limited to
telephone Installation details, etc.) requirements. Contractor is also
required to submit the estimated weight of equipment, Power consumption,
heat and power load requirements. iii. on the depot's communications
requirements and technical specifications iv. on the positive line of
communication (including OCC) requirements and technical specifications v.
on a line with the existing requirements of connecting with the technical
specifications vi. on the interface requirements between systems and
technical specifications (DIS) the first draft of vii. With regard to spare
parts, special tools and test equipment of the first draft of technical
specifications e) submission of the mid-term design is to refine the
preliminary design, an extension to the main components of the system layer
Surface. It takes the data contain sufficient detail for engineers to
consider whether evaluation of the various Design. Submitted need to include
all of the following detailed design documents and design process: i. Update
the preliminary design and provide a detailed design plan submitted. ii. on
the transformation of a detailed construction plans. iii. all kinds of
consoles, dispatch units, terminals and equipment. iv. Manual of the final
plan submission. v. system to ensure that documents, type test / test and
after delivery of the initial technical specification work. vi. technical
manuals, operation manuals, maintenance manuals line, second-line maintenance
manual, workshop Manual work and the purchase of equipment, the draft
manual. vii. spare parts, special tools and test equipment of the second
draft of technical specifications. viii. and interfaces to other systems
detailed preliminary technical specifications and detailed interfaces of the
initial Designated, including the Annex III of Volume III, "Interface
Specification" DITP set forth in the grass The following is issued.
The first book dedicated
special requirements specification 40 ix. DITP for each interface
defined in the contract testing interface connector interface test Special
norms (ITSP) the first draft of x. system requirements specification and
system verification and confirmation of the plan. Owners to provide a
project reference to the relevant drawings for the contractor, the contractor
has the responsibility for the content of the drawings into Visit the site
to verify and confirm, and verify the results of the implementation of the
design drawings. Submitted by the contractor "off In the transformation of a
detailed construction plan "should include (but are not limited to) the
following: phased construction program (Method Statement) old and
new software switch procedure (Changeover Plan) Recovery Plan (Recovery
Plan) contingency plans (Contingency Plan) Software withdrawal
(Fallback) arrangements Accident risks and countermeasures
Construction period Risks and Countermeasures Construction
contractors have to plan in detail a detailed analysis of potential technical
risks and associated response (hereinafter Is part of the risk can be met
and the proposed countermeasures), the construction should take appropriate
measures to avoid Impact on the 4th line and a station operator OCC.
Contractor shall take appropriate measures to mitigate the risks and for
Tam-related risks. Description of project risk response / risk
mitigation methods 1 as a result of non-travel time is short, test May
be extended to inter-travel time, or too much access Near travel time and
travel time result in Failed to restore the old software version. The
contractor is required to set a timetable for conducting the tests, Strictly
control the time, set aside sufficient Time before the resumption of travel
time in the old The normal operation of the software version. 2 in the
transformation of the existing system software during the free Intended to
change the functions of the old requirements or the number of According to
the Treasury. The contractor is required to carry out random regression test
Try to prove that the old functions and database Not be affected. 3
When the transformation of the software after the completion of all tests
And put into operation after the failure. Contractor failure requiring
immediate sub - Analysis, correction and, if necessary, to retreat back to
The old software version. 4 one stop supplier of both parts of the
equipment, GM did not have the necessary components. The contractor is
required to complete the study as soon as possible the transformation A
device the necessary equipment and the Department of Pieces, and with the
suppliers to understand the situation Shape. 5 non-travel time back to
the old test of the soft Case version, but failed to monitor the function of
reason Recovery, until the traffic operations during the period
Contractor in the restoration of the old software version View the
system immediately after the normal delivery For, in case of any problems
immediately with the The first
book dedicated special requirements specification 41 Found. Progressive.
6 The improved system or interface system is not entitled Software
assistance agreement, the system can not be shipped normal For. On-site
verification testing prior to software Platform test, the successful
completion of software Qualcomm Letter agreement, the database / MMI
matching Testing site before testing. f) for the final design submitted,
the contractor required to complete the design of collaborative interfaces.
Final set Submitted need to include all of the design process and design
documents, including previously submitted course work All the views of
engineers and co-design information, which reads as follows: i. on a
transformation of the equipment and interfaces. ii. all the interface
design. iii. depot communications systems. iv. are lines (including OCC)
communications systems and interfaces. v. System Design technical
specifications and system test specifications. g) submission of final design
(including the transformation of a part) need to include the following: i.
the principle of system design, security, reliability and maintainability
review, including electromagnetic Compatible with the type of documents and
test / post-delivery test specifications. ii. spare parts, special tools and
test equipment specifications. iii. technical manuals, operation manuals,
maintenance manuals line, second-line maintenance manual, workshop Manual
work and the purchase of equipment to update the manual version. iv. trial
run of the test is completed the preliminary draft of technical specifications.
v. details of the contract for each interface of the Interface Specification
(DIS) interface and detailed test Plan (DITP). vi. DITP interface for
each interface defined in the contract testing interface to test skills
Operation specification (ITSP).