System debugging in conjunction

    

1 The purpose of testing is to verify the function of the system, integrated functions and in accordance with this "special regulation
Fan, "with the designated interface provided by the contractor to operate correctly.
2 system with the FBI and the need to meet the access line from the depot to the Hongshan Station - Longsheng Hydropower Station to the east line of the cross
As between the range of four kilometers of transmission line test needs.

3 of these tests should be the presence of engineers from the contractor. Test any missing
Subsidence contractor will have to be corrected immediately, the resulting burden borne by the contractor. All affected
Equipment must be re-tested.
4 Interface with other contractors to test
a) the test should be systematic, sequential and logical manner to determine the starting position from the beginning,
To the whole system, subsystem or phased to promote the desired goal. Test procedure should reflect the will
To carry out the order of the test. Typical of the testing phase, including but not limited to the following
Item:
b) the "point-to-point test" to test the transmission and the telephone system from man-machine interface (MMI)
To interface the system controller / terminal, in order to verify the functionality and input / output of the correct action
For, including the alarm information.
c) in the "point-to-point test" Following the success of the "end-to-end testing." The test is
From the transmission and the telephone system to interface MMI system on-site equipment, in order to verify that each set
Preparation of control and monitoring functions and display.
d) a high level of functional tests to verify transmission and the telephone system interface with each system
Function in accordance with the "Private Standards" requirements.
5 System Test
a) in all the independent subsystems FBI after the test is completed, the contractor should be asked to carry out integrated testing
Test to verify the correct operation of the entire system to test the scope of the system and by other contractors
There are various aspects of interface and content in line with the norms. Details of these tests should be submitted to the
Engineers to be approved. Tests carried out by the contractor and witnessed by the Engineer.
b) contractors should use their own funds, during the test may be of any obvious defects into
Line correction. Contractor should be corrected immediately after the re-testing, re-test should be a project
Witnessed division. Contractors such as engineers to make the correction that is likely to work without the other
Changes have an impact on some, engineers will be asked to retain the right to revert to the test.
c) the contractor should be in integration testing is completed, submit three copies of test records system to work
Engineers to be approved.
6 System Performance Testing
a) the completion of the Integrated System Test after test, the contractor shall conduct system performance tests to verify
Transmission and the telephone system to meet the "exclusive norms," Chapter 4 and related provisions
The performance requirements.
b) part of the system failure, such as server / communications front-end unit to the hot line
Reports, communications path switch, the contractor to verify the normal operation of the system.
c) The contractor is required to simulate the conditions of the test to validate the system to meet the "exclusive norms," the first
And the relevant provisions of Chapter 4 of the full specified performance requirements under the state.