| System debugging in conjunction
|
|
1 The purpose of testing is to verify the function of the system,
integrated functions and in accordance with this "special regulation Fan,
"with the designated interface provided by the contractor to operate correctly.
2 system with the FBI and the need to meet the access line from the
depot to the Hongshan Station - Longsheng Hydropower Station to the east line of
the cross As between the range of four kilometers of transmission line test
needs. 3 of these tests should be
the presence of engineers from the contractor. Test any missing Subsidence
contractor will have to be corrected immediately, the resulting burden borne by
the contractor. All affected Equipment must be re-tested. 4
Interface with other contractors to test a) the test should be systematic,
sequential and logical manner to determine the starting position from the
beginning, To the whole system, subsystem or phased to promote the desired
goal. Test procedure should reflect the will To carry out the order of the
test. Typical of the testing phase, including but not limited to the following
Item: b) the "point-to-point test" to test the transmission and the
telephone system from man-machine interface (MMI) To interface the system
controller / terminal, in order to verify the functionality and input / output
of the correct action For, including the alarm information. c) in the
"point-to-point test" Following the success of the "end-to-end testing." The
test is From the transmission and the telephone system to interface MMI
system on-site equipment, in order to verify that each set Preparation of
control and monitoring functions and display. d) a high level of functional
tests to verify transmission and the telephone system interface with each system
Function in accordance with the "Private Standards" requirements. 5
System Test a) in all the independent subsystems FBI after the test is
completed, the contractor should be asked to carry out integrated testing
Test to verify the correct operation of the entire system to test the scope
of the system and by other contractors There are various aspects of
interface and content in line with the norms. Details of these tests should be
submitted to the Engineers to be approved. Tests carried out by the
contractor and witnessed by the Engineer. b) contractors should use their
own funds, during the test may be of any obvious defects into Line
correction. Contractor should be corrected immediately after the re-testing,
re-test should be a project Witnessed division. Contractors such as
engineers to make the correction that is likely to work without the other
Changes have an impact on some, engineers will be asked to retain the right
to revert to the test. c) the contractor should be in integration testing is
completed, submit three copies of test records system to work Engineers to
be approved. 6 System Performance Testing a) the completion of the
Integrated System Test after test, the contractor shall conduct system
performance tests to verify Transmission and the telephone system to meet
the "exclusive norms," Chapter 4 and related provisions The performance
requirements. b) part of the system failure, such as server / communications
front-end unit to the hot line Reports, communications path switch, the
contractor to verify the normal operation of the system. c) The contractor
is required to simulate the conditions of the test to validate the system to
meet the "exclusive norms," the first And the relevant provisions of Chapter
4 of the full specified performance requirements under the state.