About-network-video:
video-solution:
Related-links:
|
| Test (TEST RUNNING)
|
|
|
Test (TEST RUNNING) a) contractor to test the
performance stages of the monitoring system. If performance deviated from the
"special rules Fan "requirement, the contractor should make every effort in
the shortest possible time to be corrected. b) all systems must be put into
operation stage of trial operation. Stage in a series of trial operation
System Verification Test. Test run will be based upon completion of the
contract the contractor the ultimate test. 8.12 Pre-operation (TRIAL
RUNNING) Immediately after completion of a period of time, without picking
up passengers, the owners will operate the entire operations Lines of a
phase or part of a simulation of the Customer Service operations, including
failures and emergency situations, on the occasion of Put into commercial
operation in the pre-service training of staff and operations to achieve the
desired performance standards. 8.13 test operation (TRIAL OPERATIONS)
Means immediately after the opening of not more than two years, the owners
will be officially operating lines, and picking up passengers close Check
fares.
Related Product:
กก
|
| |
|
|