Google
กก

Home | Product | Solution |Purchase | contract-us

กก
กก
Test (TEST RUNNING)

    

Test (TEST RUNNING)
a) contractor to test the performance stages of the monitoring system. If performance deviated from the "special rules
Fan "requirement, the contractor should make every effort in the shortest possible time to be corrected.
b) all systems must be put into operation stage of trial operation. Stage in a series of trial operation
System Verification Test. Test run will be based upon completion of the contract the contractor the ultimate test.
8.12 Pre-operation (TRIAL RUNNING)
Immediately after completion of a period of time, without picking up passengers, the owners will operate the entire operations
Lines of a phase or part of a simulation of the Customer Service operations, including failures and emergency situations, on the occasion of
Put into commercial operation in the pre-service training of staff and operations to achieve the desired performance standards.
8.13 test operation (TRIAL OPERATIONS)
Means immediately after the opening of not more than two years, the owners will be officially operating lines, and picking up passengers close
Check fares.

Related Product:

       

กก