Testing requirements

    

1 Overview
1.1 tests designed to verify the transfer of the contract with the telephone system and its components, interfaces, etc., have in accordance with the
Bamboo mold-specific regulation in terms of safety, performance, reliability, maintainability and interoperability requirements. Contractors should be held
Select the test system to meet the needs of engineers can carry out the requirements of acceptance, including with other designated
Test system interface.

In the testing and acceptance process, the engineer may request a repeat test to simulate the likely
Serious impact on system security or reliability of the key software / hardware failure mode.
1.4 All test time should be set aside sufficient time for the equipment, systems and design modifications
And in operation prior to the completion of all necessary retest.
1.5 System testing should prove that is in line with the specifications of system requirements, interface requirements and system configuration. Any
HE system to meet the requirements of the modifications made necessary by the change must be in accordance with the relevant procedures and to retain the text
Case records.
 
The first book dedicated special requirements specification
52
1.6 Contractor shall be responsible for the following:
a) the preparation of test plans and procedures;
b) test plan to complete the test items;
c) assessment of test results;
d) be amended as needed and re-testing;
e) submit a final test results.
1.7 in the production of test sites and testing of plant shall be issued prior to 21 days notice. For other test
Test, the contractor shall be scheduled one month before the testing date, written notice to engineers, but also to the Public
Engineers provide the equipment / system, a complete set of specification and test procedures have been approved.
1.8 in accordance with the specification requirements described in a full range of testing and testing to ensure that the entire system of transportation
For in all respects comply with regulatory requirements. These tests will include:
a) Software Testing
b) acceptance testing of systems
c) Interface Test
d) System Test
1.9 Contractor shall provide all necessary testing equipment to assist in all testing and FBI activities.
2 test plans and procedures
2.1 Engineers contractor to submit a test plan for review and approval, including time-tested and
Test sites. Test in the planning process, the contractors and engineers need to deal with what the test engineer
Or their representatives to participate in consensus.
2.2 Test Plan need to include works in various stages of testing by different test methods used, the contractor is fully
The contractor shall be designated with the FBI to work together to develop test plans.
2.3 Test Plan is approved, the project period system design based on the development of modified test plan and, if
The need for additional testing requirements. Contractors need to refer to General Regulations List of bamboo mold testing, including but not limited
In all the tests described in the following requirements:
a) said from the beginning of the test sample to test the flow chart of logical order, inspection, including all access
I (a factory or other aspects of) the tests to the system acceptance test at the time of testing as the end of
Test.
b) submit a list of test procedure (from the testing procedures and code components), the initial test program, the
Factory testing and validation of all equipment on-site verification tests.
 
The first book dedicated special requirements specification
53
c) the procedure for each test, the test points and format data sheets, including but not limited to, the following items
Head:
 visual detection
 detailed testing
 electrical equipment testing
Preliminary testing 
Table  control test
 functional testing
 subsystem test
 system testing
 integration testing
 dynamic and static testing
 information and warning level test
2.4 The contractor is required to test at least six months before the start of the test plan submitted to allow engineers approved. Test Plan
Shun row manner using the testing strategy and procedures described.
2.5 Test Plan including test specifications to identify, test steps, method statements and test records. Test of
Designated document must include the submission of the test time.
2.6 Test documentation
2.7 Upon completion of each test within two weeks, contractors are required to submit test reports, so that engineers approved.
2.8 from the test plan to the final transfer of equipment or system will be used throughout the process must be security
There is complete documentation for record purpose. Documents including test plans, test specifications, test steps, side
Method statements, test records and test reports.
3 A post-mortem test prototype (PROTOTYPE TEST)
Submitted by the contractor to engineer human-machine interface, scheduling console, special phone, touch screen console
Hardware components such as the prototype for approval. Prototype test results need to be modified, and it certainly
In the production of equipment to be carried out on changes to amend the record and do a good job.