About-network-video:
video-solution:
Related-links:
|
| Testing requirements
|
|
1 Overview 1.1 tests designed to verify the transfer of the contract
with the telephone system and its components, interfaces, etc., have in
accordance with the Bamboo mold-specific regulation in terms of safety,
performance, reliability, maintainability and interoperability requirements.
Contractors should be held Select the test system to meet the needs of
engineers can carry out the requirements of acceptance, including with other
designated Test system interface.
In the testing and acceptance
process, the engineer may request a repeat test to simulate the likely
Serious impact on system security or reliability of the key software /
hardware failure mode. 1.4 All test time should be set aside sufficient
time for the equipment, systems and design modifications And in operation
prior to the completion of all necessary retest. 1.5 System testing should
prove that is in line with the specifications of system requirements, interface
requirements and system configuration. Any HE system to meet the
requirements of the modifications made necessary by the change must be in
accordance with the relevant procedures and to retain the text Case records.
The first book dedicated
special requirements specification 52 1.6 Contractor shall be
responsible for the following: a) the preparation of test plans and
procedures; b) test plan to complete the test items; c) assessment of
test results; d) be amended as needed and re-testing; e) submit a final
test results. 1.7 in the production of test sites and testing of plant
shall be issued prior to 21 days notice. For other test Test, the contractor
shall be scheduled one month before the testing date, written notice to
engineers, but also to the Public Engineers provide the equipment / system,
a complete set of specification and test procedures have been approved.
1.8 in accordance with the specification requirements described in a full
range of testing and testing to ensure that the entire system of transportation
For in all respects comply with regulatory requirements. These tests will
include: a) Software Testing b) acceptance testing of systems c)
Interface Test d) System Test 1.9 Contractor shall provide all
necessary testing equipment to assist in all testing and FBI activities. 2
test plans and procedures 2.1 Engineers contractor to submit a test plan
for review and approval, including time-tested and Test sites. Test in the
planning process, the contractors and engineers need to deal with what the test
engineer Or their representatives to participate in consensus. 2.2
Test Plan need to include works in various stages of testing by different test
methods used, the contractor is fully The contractor shall be designated
with the FBI to work together to develop test plans. 2.3 Test Plan is
approved, the project period system design based on the development of modified
test plan and, if The need for additional testing requirements. Contractors
need to refer to General Regulations List of bamboo mold testing, including but
not limited In all the tests described in the following requirements: a)
said from the beginning of the test sample to test the flow chart of logical
order, inspection, including all access I (a factory or other aspects of)
the tests to the system acceptance test at the time of testing as the end of
Test. b) submit a list of test procedure (from the testing procedures
and code components), the initial test program, the Factory testing and
validation of all equipment on-site verification tests. The first book dedicated special requirements
specification 53 c) the procedure for each test, the test points and
format data sheets, including but not limited to, the following items Head:
visual detection detailed testing electrical equipment
testing Preliminary testing Table control test functional
testing subsystem test system testing integration testing
dynamic and static testing information and warning level test
2.4 The contractor is required to test at least six months before the
start of the test plan submitted to allow engineers approved. Test Plan Shun
row manner using the testing strategy and procedures described. 2.5 Test
Plan including test specifications to identify, test steps, method statements
and test records. Test of Designated document must include the submission of
the test time. 2.6 Test documentation 2.7 Upon completion of each
test within two weeks, contractors are required to submit test reports, so that
engineers approved. 2.8 from the test plan to the final transfer of
equipment or system will be used throughout the process must be security
There is complete documentation for record purpose. Documents including test
plans, test specifications, test steps, side Method statements, test records
and test reports. 3 A post-mortem test prototype (PROTOTYPE TEST)
Submitted by the contractor to engineer human-machine interface, scheduling
console, special phone, touch screen console Hardware components such as the
prototype for approval. Prototype test results need to be modified, and it
certainly In the production of equipment to be carried out on changes to
amend the record and do a good job.
Related Product:
กก
|
| |
|
|