The scope of this contract, including new
transmission and the second phase project of the existing telephone system and
an engineering and telephone transmission
System, making a system with two
integrated systems can be unified operation and management, the specific content
of
Include:
a) transmission and telephone system design, equipment
manufacture, supply, delivery, installation, testing, the
Stressed that the
test run and deficiencies within the notice period for limited maintenance;
b) Chapter 7, "Design requirements" referred to in the delivery of drawings,
documents and other services;
c) Chapter 8, "test" as described in the test,
verification and other services;
d) Chapter 9-pin "training requirements"
for the owners and their representatives referred to the provision of training
services;
e) Chapter 10 "spare parts and test equipment" necessary tools,
instruments, meters, spare parts prepared
Parts.
3.1.4 Contractor shall
be responsible for the application to the telecommunications network and
installation of trunk telephone calls related to work, trunk rental
Rent
costs born by the owners.
3.1.5 The contractor is required to fire
detection, fire inspection and fire inspection, fire inspection and to ensure
through. Such as
Issue that needs to be responsible for coordinating the
event and corrections, to ensure that the eventual adoption of the fire
inspection.
3.1.6 The contractor is required to the relevant professional
organizations to carry out joint inspection prior to the relevant fire test, as
well as the organization of fire
Application and inspection