Google
 

Home | Product | Solution |Purchase | contract-us

 
 
Training methods

    

1 Contractor shall be in accordance with the needs of the project in the field training, classrooms, manufacturers and the general part of the contractor
Owners do not complete the training of relevant personnel.
2 the number of trainers, classroom, and the number of categories should be made clear, and the owners submitted for review.
3 language training materials and training for Chinese and English, mainly in Chinese.
4 Where necessary, the contractor should be provided in both English and Chinese translators.
 

 outside the training
1 Contractor shall be the owner of a certain number of operations and maintenance personnel in China or outside the actual system
On training. For the maintenance of key personnel, should be related to system manufacturers for training.
2 to participate in training outside of the owners of the number of personnel, the contractor should be in the training program proposed by the owners do
Set.
 

-site training
1 Operation and maintenance personnel on-site training for system test should be carried out before. The training should be as
Operations control center, control center and station depot on the operator control room operator to control
Operating system. The training should include normal operational procedures and how to deal with emergencies.
2 training facilities at the scene by the owners, including housing, classrooms, furniture, projectors.
3 Contractor shall provide training in special equipment, tools, instruments, meters and so on.

Related Product: