Transfer operations

    

1 Transmission and telephone systems should include the phased transfer of activities to achieve the final configuration of the range. This
Some should not lead to any interruption of work or operation of railways in any way affect the day-to-day.
2 from the initial to the final (and from the final to initial) of the transfer of system configuration will include the designation and
There are interfaces provided by the central contractor equipment hardware and software changes. Contractor to deal with the station
Transmission equipment and telephone system and the FBI to make a comprehensive test, as well as together with the designated and the principal interface
Contractor for the transfer of the activities of integration testing.
3 before completion, the contractor should be time in the non-railway operations (Non-traffic Hours, NTH) and refers to
Set and interface system contractor FBI final test configuration. In the test is completed,
For day-to-day operation of the train system should be restored to its original configuration.
4 In the trial run carried out within three months after the designation of the railway and the contractor will interface interface requirements in
Permanent central equipment hardware and software changes. In the permanent conversion, the contractor should be present at
These activities and provide support for activities and interface with the specified and the contractor re-integration test
Test. All these activities should be carried out in non-traffic hours.
5 In response to the designated interface and the time of the transmission and the telephone system there is no need for a permanent transfer in the
Same period for non-traffic times