Contractor to carry out fire safety information to
collate and submit the file through the (including the transformation of a
project file
Submitted work).
3.1.8 station, depot of public and
non-public areas of the cable pipeline contractors and building services system
will be put
For. Transmission and the telephone system to the owners of the
contractor to provide a comprehensive line of the first phase of plans to
conduct nuclear
Yes, confirmed that the path shown in the pipeline, the
number of contractors have to meet requirements. If the pipeline plan to be
integrated
To change the path, or increase or decrease in the number of
pipeline, the contractor shall be issued by drawing in the day to 28 days
Written response. Owners will be arranged in accordance with the request to
change the related drawings, and to provide the second phase of a comprehensive
Line drawings.
3.1.9 Contractor shall be responsible for providing the
required equipment to the contractor's own cable systems or pipeline
distribution box
Secondary pipeline path (that is, a branch of the cable
pipeline system) connection. The path of such pipelines should be included in
this
Special norms described in detail and all the other interface
specification or in the specification document no description
The contractor
shall be referred to the secondary path.
3.1.10 contractor contractor should
be coordinated with other cable pipeline system as described in the installation
and use, is responsible for cable
Through the wall, floor, after the
closure. See the specific requirements related to the special norms of Volume
III, "then
I norms "and" Annex IX. "