fire safety information

    

Contractor to carry out fire safety information to collate and submit the file through the (including the transformation of a project file
Submitted work).
3.1.8 station, depot of public and non-public areas of the cable pipeline contractors and building services system will be put
For. Transmission and the telephone system to the owners of the contractor to provide a comprehensive line of the first phase of plans to conduct nuclear
Yes, confirmed that the path shown in the pipeline, the number of contractors have to meet requirements. If the pipeline plan to be integrated
To change the path, or increase or decrease in the number of pipeline, the contractor shall be issued by drawing in the day to 28 days
Written response. Owners will be arranged in accordance with the request to change the related drawings, and to provide the second phase of a comprehensive
Line drawings.
3.1.9 Contractor shall be responsible for providing the required equipment to the contractor's own cable systems or pipeline distribution box
Secondary pipeline path (that is, a branch of the cable pipeline system) connection. The path of such pipelines should be included in this
Special norms described in detail and all the other interface specification or in the specification document no description
The contractor shall be referred to the secondary path.
3.1.10 contractor contractor should be coordinated with other cable pipeline system as described in the installation and use, is responsible for cable
Through the wall, floor, after the closure. See the specific requirements related to the special norms of Volume III, "then
I norms "and" Annex IX. "